New Service Requests - New Construction
These procedures apply to customers who may have questions regarding new service connections. These connections include new constructions, fire sprinkler meters, and irrigation meters.
Please complete the Service Availability Application and return it to our office. Green Valley Lake Customers, click here.
An owner desiring water, sewer, and fire protection services shall make application at the District office. A plan check fee of $220 is due at the time of application along with the submittal of the required plans prior to plan check processing and issuance of service availability letters.
Plan Check Fees (subject to change):
$50 Water and Sewer
$25 Sewer Only - Green Valley Lake
Click here to pay.
$170 Fire Letter
$197 Fire Sprinkler Plan Review
Click here to pay.
See Rates and Fees for other applicable fees
PLOT PLANS: At the time of application, plans shall be submitted on 11” x 17” or larger sheets at a minimum scale of 1” = 10’, printed and stapled together to form a complete set. Two complete sets will be required with each application (one electronic copy is also preferred). Plans must be signed by the person who prepared them. Plans must be picked up within one month after notification by the District that plan check is complete. IF plans are not picked up with in one month, they will be returned to the applicant and the $220 plan check fee will be retained by the District. If plans are resubmitted at a later date, an additional plan check fee of $220 will be required. Plans must include:
Legal owner’s name and phone number
Lot, Block, and Tract
Address (must have address from San Bernardino
County)Assessor’s Parcel Number
Lot Dimensions
Names of surrounding streets
Distances to structures on adjacent lots, if structures are less than 30 feet from construction (including, but not limited to, existing or proposed neighboring properties including homes, barns, garages, sheds, wells, outhouses, etc.)
Topographical Survey including points of access
Square Footage
New Construction - all livable and non-livable/residential storage
Addition - existing and proposed
Additions - floor plans for the existing structure
Letters take three (3) weeks for processing. Only the owner may pick up the set of Letters. An agent must provide the District with a notarized Letter of Authorization from owner to pick up plans.
Running Springs Area Meter Installation Fees and Capacity Charges (subject to change):
3/4” Meter Installation: $1,255.00
Water Facilities Capacity Charge: $5,120.00
Sewer Facilities Capacity Charge (per EDU): $6,687.00
1” Fire Meter Installation Deposit: $2,875.00
Total: $15,937.00
Green Valley Lake Sewer Capacity Charge (subject to change):
$5,336.22 (per EDU)